Illustrative image – not actual.The National Highways Authority of India (NHAI) has floated tender for six-lane, access-controlled highway under Bharatmala Pariyojana.
The scope of work involves development of six-lane, access-controlled highway from design ch 0.000 (Ganeshpur) to design ch 8.130 (near Mohand) of Ganeshpur-Dehradun section of NH-72A in the state of Uttar Pradesh on EPC mode (Package-1).
The work will be completed in 24 months at a cost of Rs 707.88 crore.
The scope of work involves development of six-lane, access-controlled highway from design ch 0.000 (Ganeshpur) to design ch 8.130 (near Mohand) of Ganeshpur-Dehradun section of NH-72A in the state of Uttar Pradesh on EPC mode (Package-1).
The work will be completed in 24 months at a cost of Rs 707.88 crore.
