Illustrative image – not actual.The National Highways Authority of India (NHAI) has floated tender for Neelmangala-Tumkur section.
The scope of work involves six-laning with access control from 29.435 km to 74.168 km of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (old NH-4) in the state of Karnataka on EPC mode under Bharatmala Pariyojna.
The work will be completed in a period of 36 months at a cost of Rs 1,245.56 crore.
The scope of work involves six-laning with access control from 29.435 km to 74.168 km of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (old NH-4) in the state of Karnataka on EPC mode under Bharatmala Pariyojna.
The work will be completed in a period of 36 months at a cost of Rs 1,245.56 crore.
