Illustrative image – not actual.
The National Highways Authority of India (NHAI) has invited bids for four-laning of Bamni to MH/TG Border.
The scope of work includes four-laning of the existing two-lane stretch from Bamni (design 19.00 km) to MH/TG Border (design 51.985 km) (design length 32.985 km) section of NH-930D in the state of Maharashtra on hybrid annuity mode (HAM) under NH(O).
The estimated value of the project is Rs 859.33 crore.
