Illustrative image – not actual.
The National Highways Authority of India (NHAI) has invited bids for construction works of Patan-Gojariya section.
The scope of work includes construction of four-lane divided carriageway with paved shoulder from Patan (near Rajpur) at 52.000 km (design) to Gojariya at 128.940 km (design), a length of 76.940 km (Package-II) of NH-68 in the state of Gujarat under NH(O) on EPC mode.
The estimated value of the work is Rs 875.83 crore with completion period of 24 months.
