Illustrative image – not actual.The National Highways Authority of India (NHAI) has declared the appointed date for DBL Mangloor Highways, a wholly-owned subsidiary of Dilip Buildcon (DBL).
The company has received the appointed date as 12 April 2019, from NHAI.
The scope of work involves four-laning of NH-161 from Mangloor (design 86.788 km /existing 91.350 km) to Telangana/Maharashtra Border (design 135.751 km /existing 140.873 km) (design length= 48.963 km) in the state of Telangana under Bharatmala Pariyojana on hybrid annuity mode (HAM).
The cost of the project is Rs 936 crore with construction period of 24 months. The operation period of the project is 15 years from commercial operation date (COD).
