NHAI begins DPR preparation to ease traffic congestion in South East DelhiIllustrative image – not actual.

The National Highways Authority of India (NHAI) has started preparing a detailed project report (DPR) to identify long-term engineering solutions for easing congestion at the Sarai Kale Khan interchange in Delhi.

The move comes after concerns that traffic pressure will increase with the upcoming operation of the DND-Sohna section of NH-148NA under the Delhi-Mumbai Expressway. Sarai Kale Khan is a major traffic convergence point where vehicles from Ring Road, DND Flyway, Barapullah flyover, and routes connecting east and south Delhi merge, causing severe bottlenecks during peak hours. Traffic queues on Ring Road often extend up to two km, while vehicles approaching from Barapullah face prolonged delays. The upcoming expressway corridor is expected to add another major traffic flow to the already crowded interchange. Delhi Traffic Police had earlier suggested engineering and traffic management measures to address the issue.

NHAI’s DPR will assess possible solutions to improve traffic movement, enhance road efficiency, and prevent future congestion at the critical junction.

← All latest storiesBack to top →