Illustrative image – not actual.National Highways Authority of India (NHAI) has awarded two contracts for the construction of two major bridges on Vijayawada-Visakhapatnam section of NH-5 in Andhra Pradesh, to Larsen & Toubro (L&T).
The first contract includes a new two lane, 2.34 km long major bridge across the River Gautami and a medium bridge across the Alamuru Canal, Dhawaleswaram Canal and a rail over bridge (ROB) near Hukumpet. The value of this contract is Rs.102.94 crore.
The second contract worth Rs.100.25 crore includes
construction of a major bridge across the Yenamadurr Drain, River Vashista and
medium bridges across Athili Canal, Naraspur Canal, a ROB at Tanuku including
other structures in Tadepalleguden Bypass.
L&T plans to start construction for these
projects in September 2001 and complete the same by December 2003. These
projects would be financed through domestic funding.
