Illustrative image – not actual.
The National Green Tribunal (NGT) has suspended the environment clearance (EC) accorded by the Union Ministry of Environment and Forest and Climate Change (MoEF&CC) to the 780-MW Nyam Jang Chhu hydroelectric power project in Arunachal Pradesh.
The project envisages construction of a 10.2 metre high and 15 metre long barrage on the eco-sensitive stretch of Nyamjang Chhu River basin near Zemithangin. The project involves construction of a 23.4 km-long and 6.2 metre diameter head race tunnel (HRT) requiring extensive tunneling in a geologically fragile landscape and comprises eight de-silting chambers with underground power house having 6×130 MW pelton turbines. The HRT bypasses around a 35 km stretch of river between the barrage and the powerhouse.
The project also involves construction of a captive hydropower project of 7.5 MW, Khangteng HEP, to provide power during construction of the 780-MW Nyam Jang Chhu project. The total submergence area of the project is 39.34 hectare, and 89.527 hectare of forest land has been considered for the diversion proposal for the project.
