Illustrative image – not actual.
The National Green Tribunal’s (NGT) Western Zone Bench has issued an interim stay on a section of the Pune Metro project. The stay was issued for the Metro route passing through the Mula-Mutha river bed in Pune.
The estimated cost of the project is Rs 11,420 crore. On 24 December, 2016, Prime Minister Narendra Modi laid the foundation stone for the project.
The petitioners filed the case stating destruction of the riverbank ecosystem along this route.
The Tribunal has ordered the Pune Municipal Corporation not to construct in the prohibited zone of 1.7 km on the left bank of the river which is inside the blue line of the river bed of Mula Mutha, till 25 January, 2017.
However, the work of designing, planning and approval can be carried out further.
