Neyveli Lignite's 250 MW boiler operating at full load in Tamil NaduIllustrative image – not actual.

BHEL, on 7 February 2012, successfully demonstrated full-load operation of its 250 MW circulating fluidised bed combustion (CFBC) boiler at Neyveli Lignite Corporation’s (NLC).

BHEL had supplied four CFBC boilers to NLC. While the two 250 MW units are located in its home town and near the pit head at Neyveli in Tamil Nadu, the other two units (2x125 MW) are in Rajasthan. The remaining unit of 250 MW is likely to be lit up soon. The two 125 MW CFBC boilers supplied to NLC's Rajasthan unit are functioning well.

Related Links:
Project profile

← All latest storiesBack to top →