Neyveli Lignite Corporation plans to modernise its fertiliser plant and chemical units, which have been operating at low levels. The plants have an installed capacity of 1,52,000 tonne of urea per annum. However, the present production is only at 17,200 tonne instead of the targeted 96,000 tonne per annum. The proposed modernization was expected to enable the company to carry out increased production and attain its targets.

← All latest storiesBack to top →