New terminal at Mumbai airport inauguratedIllustrative image – not actual.

The Mumbai International Airport (MIAL) on 17 April 2010 inaugurated the new domestic terminal, 1C, at the Chhatrapati Shivaji International Airport.

The terminal has been built at a cost of Rs 300 crore and is spread over 297,194 sq ft across three levels. It will be used to connect terminal 1A and 1B and has a seating capacity of about 900 passengers.

Level 1 will house Kingfisher, Air India, Jet Airways and MIAL offices, while Level 2 will be the security-hold area for passengers after checking in at either terminal 1A or 1B. It will also have six aerobridges. Level 3 will have a food court.

Related Links:
Project profile 

← All latest storiesBack to top →