New Osmania General Hospital to be completed at Rs 1,667-cr outlayIllustrative image – not actual.

The new Osmania General Hospital (OGH) in Hyderabad is set to be completed within 30 months at an estimated cost of Rs 1,667 crore, according to the tender issued by the Roads and Buildings Department.

The 12-floor facility, including two basement levels for parking, will cover a total built-up area of 23.42 lakh sq. ft. Of the total cost, Rs 979 crore is allocated for the main hospital block. Other key components include Rs 103 crore for male and female hostels, Rs 72 crore for an academic block, Rs 54 crore for utilities, and Rs 17 crore for a dharmashala. Infrastructure works like roads and drainage are estimated at Rs 10 crore, while Rs eight crore is designated for covering nalas. The mortuary, compound wall and security gates are also covered.

Water and sanitation installations are budgeted at Rs 24 crore, while electro-mechanical systems, including power, lifts, and HVAC, are allocated Rs 384 crore. Hostels and academic buildings will range from eight to 12 floors, and construction will follow four milestones at 9, 18, 24, and 30 months. Telangana CM A Revanth Reddy laid the foundation stone on 31 January, alongside Health Minister C Damodar Raja Narasimha.

← All latest storiesBack to top →