New economic corridor projects worth Rs 20,000 cr launched in HaryanaIllustrative image – not actual.
Union Minister for Road Transport, Highways and MSMEs Nitin Gadkari inaugurated and laid the foundation stones of various highway projects as part of a new economic corridor in Haryana on 14 July 2020. The cumulative cost of the projects is Rs 20,000 crore.
 
The projects inaugurated include the 35.45 km four-lane Rohna/Hasangarh to Jhajjar section of NH-334B with an investment of Rs 1,183 crore, the 70 km four-laning of Punjab-Haryana Border to Jind section of NH 71 worth Rs 857 crore, and the 85.36 km two-lane with paved shoulders Jind-Karnal Highway on NH-709 worth Rs 200 crore.
 
The foundation stones were laid for projects including the 227 km six-lane access-controlled greenfield expressway from Ismailpur to Narnaul on NH-152D in eight packages entailing an investment of Rs 8,650 crore. The 46 km four-lane Gurugram Pataudi-Rewari section of NH-352W worth Rs 1,524 crore, the 14.4 km four-lane Rewari Bypass worth Rs 928 crore, the 30.45 km four-lane Rewari-Ateli Mandi section of NH-11 worth Rs 1,057 crore.
 
The other projects include 40.8 km six-lane Narnaul Bypass on NH-148B, NH-11 and Narnaul to Ateli Mandi section of NH-11 worth Rs 1,380 crore, 40.6 km four-lane Jind-Gohana (Pkg-1, greenfield alignment) of NH-352A entailing an investment of Rs 1,207 crore.
 
The 38.23 km four-lane Gohana-Sonipat section of NH-352A costing Rs 1,502 crore, and the 40.47 km four-lane Uttar Pradesh-Haryana Border to Roha on NH-334B worth Rs 1,509 crore.
 
The Centre in a joint effort with the government of Haryana will be developing industrial clusters including MSMEs, smart cities and smart villages, also develop Khadi and Village industries alongside the expressway projects particularly the New Delhi-Mumbai Expressway.
 
The Centre has a target of providing five crore jobs through MSMEs in the next five years and enhancing KVIC turnover manifold from present level of Rs 8,8000 crore per annum.
 
The state has so far developed/improved 29,406 km long roads during the last five years. Further, budget allocations have been made for construction of ROBs/RUBs at all railway crossings to prevent accidents.
 
The Centre has urged the Chief Minister of Haryana to consider developing Rwewary bypass project into a ring road of the city of Rewari to help  decongestion. The National Highways Authority of India (NHAI) is implementing projects work over Rs 37,000 crore in Haryana.
 
In 2014, total NH length in Haryana was 2,050 km, which has now been brought up to 3,237 km. The NH density of 75 km per 1,000 sq km is the highest among major states of the country.
 
Four major corridors are being developed in Haryana, which include two brownfield projects of Jind-Gohana-Sonipat and Uttar Pradesh/Haryana Border-Rohna-Jhajjar.
 
The other two are greenfield projects – Ambala-Kotputli 304 km and Gurugram Rewari-Narnaul-Rajasthan Border 132 km.
 
Apart from these, several important projects have been taken up in the Delhi NCR areas around Haryana. These include the 1,350 km Delhi-Mumbai Expressway costing about Rs one lakh crore, the 600 km Delhi-Amritsar-Katra Expressway costing Rs 30,000 crore, the 30 km Dwarka Expressway costing over Rs 8,000 crore, and the 21 km Gurugram-Sohna Road costing Rs 1,630 crore, the 28 km Ambala Ring Road and the 30 km Karnal Ring Road.
 
In addition, other NH projects of 410 km are proposed, which will be awarded by 2021. In the next two-three years, 1,550 km long highways and expressways will be developed at an investment of Rs 60,000 crore. Out of this, about Rs 12,000 crore is being distributed as compensation amount to land holders in Haryana.
← All latest storiesBack to top →