Illustrative image – not actual.Bhagheeratha Engineering Ltd (BEL) of Kochi has completed the 556 metre long New Bassein Creek Bridge (Vasai Bridge) on Mumbai-Ahmedabad Section of NH-8 (km-497). This bridge, which is part of the Golden Quadrilateral, will be inaugurated and dedicated to the nation on 8 October 2001 by Maj. Gen, B.C. Khanduri (Retd), Minister of State for Road Transport & Highways.
The salient features of the bridge are:
Ø
Cost of the project is approximately Rs.33 crore
Ø
The bridge is the first of its kind in India where shock
transmission units have been installed to transfer seismic force up to 3100 KN
shock loads
Ø
It has large caisson floated foundations, positioned
21 mtrs deep in water and anchored in rock at 30 mtrs depth against heavy water
currents and tidal variations
Ø
The superstructure of the bridge is of composite type
with pre-stressed end spans cast in situ and the rest is of pre-stressed
balanced Cantilever
