New airport terminal at Leh likely to be operational by 2022-endIllustrative image – not actual.
The new airport terminal in Leh may become operational by December 2022. 
 
Civil Aviation Minister Jyotiraditya Scindia also agreed to the construction of a civil enclosure at Thoise airport, considered as the air lifeline to the world's highest and coldest battlefield, by the Airports Authority of India (AAI) once land is made available.
 
A team will shortly visit Ladakh to technically evaluate locations for additional airstrips in Leh. 
 
He agreed to look at the possibility of operationalising commercial flights with smaller jet planes to Kargil as an interim solution.
← All latest storiesBack to top →