Neradi Barrage project on Vamsadhara river in Andhra clears final hurdles with Ministry's approvalIllustrative image – not actual.

All obstacles to the construction of the Neradi barrage across the Vamsadhara River have been cleared after the Union Ministry of Jal Shakti issued a gazette notification on the Vamsadhara Water Disputes Tribunal verdict.

This marks a major breakthrough in the long-standing dispute between Andhra Pradesh and Odisha. The tribunal’s final verdict in June 2021 permitted Andhra Pradesh to build the barrage with a right sluice and directed compensation for 106 acres of land in Odisha. Delays had continued due to land acquisition issues, but the latest notification formally clears the project.

The Vamsadhara River originates in Odisha and flows into Andhra Pradesh before reaching the sea. The Neradi project, proposed in 1961, aims to irrigate over 2.5 lakh acres and support a reservoir at Hiramandalam. Despite earlier development of alternative infrastructure like the Gotta barrage and Phase-II works, water utilisation remained limited. The Neradi barrage is expected to improve irrigation efficiency and help utilise floodwaters that currently flow unused into the sea.

← All latest storiesBack to top →