Illustrative image – not actual.
Hyderabad-based NCC has emerged as the lowest bidder (L1) for Benniganahalli-Mathikere section, which is part of the 24-km Mallige Line of Bengaluru suburban rail project (BSRP). The company quoted the lowest bid at Rs 556 crore.
This section includes eight stations - Benniganahalli, Kasturi Nagar, Seva Nagar, Banaswadi, Nagawara, Kanaka Nagar, Hebbal, and Mathikere. The tender covers design, engineering, entry/exit structures, steel foot over bridges, architectural finishes, and others.
This section is part of the 24-km Mallige Line (Byappanahalli-Chikkabanavara) which includes elevated (7.7 km) and at-grade (17 km).
The Rail Infrastructure Development Company (Karnataka) (K-RIDE), which is executing the suburban rail project, has divided Mallige Line station tenders into two packages: Benniganahalli-Mathikere and Yeshwantpur-Chikkabanavara.
