NBCC issues tender to build integrated township construction at Koderma Thermal Power StationIllustrative image – not actual.

NBCC (India) has issued a tender for the construction of an integrated township at Koderma Thermal Power Station (KTPS) Phase-II, a 2x800 MW project under Damodar Valley Corporation.

The contract will be executed on a design, engineering, procurement, and construction (EPC) basis, covering all aspects from planning and design to final delivery of the township infrastructure. The integrated township is expected to provide residential and associated facilities for the staff and workforce of KTPS Phase-II, ensuring modern amenities and sustainable urban planning within the power plant campus. This reflects NBCC’s ongoing role in developing large-scale infrastructure projects for public sector utilities and supports DVC’s broader objective of creating well-planned residential and social facilities for employees.

The last adte to submit the bid is 08 April, 2026.

← All latest storiesBack to top →