Illustrative image – not actual.Navayuga Engineering Co. has been declared the lowest bidder (L1) to execute development works under Phase-I of the Yamuna Water Project in Rajasthan.
The comprehensive assignment involves building an artificial reservoir at Dhanoti (Reservoir-A), which forms a vital component of the Hansiyawas Reservoir Complex in Churu district. The work scope will cover comprehensive initial site surveys and detailed engineering design, followed by structural construction along with long-term operation and maintenance (O&M) of the entire reservoir system.
By integrating advanced methodologies with systematic maintenance frameworks, the project ensures enhanced water storage security, and structural longevity, as well as resource distribution across Churu.
