Illustrative image – not actual.
The trial for the National waterway project will be carried out by the end of December 2015.
As per sources, a 300 tonne barge is being brought from Calcutta to Dhamra to carry out the trial operation. The 201 km stretch between Jokadia near Kalinganagar and Paradip and Dhamra ports is being developed by the Noida-based central government agency in the first phase in association with the Odisha government, Paradip and Dhamra ports.
This will be part of the national waterway being planned between Talcher coalfields and Haldia port in Bengal, the idea of which was conceived in 2008.
On 30 June 2014, the authority had signed an MoU with the Odisha government, Paradip Port Trust and Dhamra Port Company for the development of the first phase of the project. In the second phase, the stretch between Talcher and Jokadia (131 km) will be developed. The two-phase project with a length of 332 km will be executed at an estimated cost of Rs 2,000 crore.
The proposed waterway will help the industries in Kalinganagar and Vyasa Nagar industrial hub, along with the mines in Talcher and Daitary, to transport their goods through the two major ports of the state.
