Illustrative image – not actual.
The National High Speed Rail Corporation has inked a memorandum of understanding (MoU) with Japan Railway Track Consultant Company for designs of high speed rail track works for T2 Package comprising 237 km between Vadodara to Vapi in Gujarat for the Mumbai-Ahmedabad High-Speed Rail Corridor project.
JRTC will provide the detailed design and drawing of major HSR track components such as RC track bed, track slab arrangement and continuous welded rail forces.
The signing of the MoU will ensure transfer of technology from Japanese high-speed rail system to India and give a boost to the MAHSR project as well as to the Make in India initiative.
The NHSRCL has also started the light detection and ranging survey for preparation of a detailed project report (DPR) for the Mumbai-Nagpur High-Speed Rail Corridor of approximately 736 km.
The LiDAR technology and imagery sensors are deployed in an aeroplane to capture the data related to ground survey.
The technology provides all ground details and data in three to four months wherein this process normally takes 10-12 months.
The Mumbai-Nagpur High-Speed Rail Corridor will connect Mumbai with cities and towns like Nagpur, Khapri Depot, Wardha, Pulgoan, KaranjaLad, Malegaon Jahangir, Mehkar, Jalna, Aurangabad, Shirdi, Nashik, Igatpuri and Shahapur.
