The Narmada Valley Development Authority has invited separate bids for execution of Badnawar Micro Irrigation Scheme in Madhya Pradesh.

The execution of micro irrigation scheme comprises lifting of 16.02 cumecs water for irrigation in 50,000 ha from Narmada River for providing water with micro-irrigation up to 2.5 ha chak with residual head of 20 mtr at 2.5 ha chak.

The work also includes survey, planning, design, drawing, estimation, land acquisition/purchase, preparation and obtaining all statutory clearance, shifting and reinstallation of existing HT and LT electrical lines, telephone lines, water supply lines, etc execution and installation of electric lines from MPPKVVCL substation to various pumping stations with all clearances from statutory authorities.

Supply, installation and testing of suitable pumps and motor with related electrical components including regulation and control of complete system by SCADA, construction of pump houses, control rooms, rising mains, gravity mains, break pressure tanks and all inline structures including road crossing of highway and other roads, pipe line, etc with all clearances from the respective authorities.

It also includes supplying and fixing miscellaneous accessories of pump houses, rising mains, etc, construction of underground piped main canal and distribution network up to 2.5 ha. chak for culturable command area.

Constructing residential and non-residential buildings with approach roads, internal roads at the pump house locations, preparation of all relevant documents for constitution of water user association of command area including establishment of farm services centre, farmer field schools and demonstration sites and all other miscellaneous works related to the entire system as directed by Engineer-in-Charge during construction.

Power consumption (including all types of power) in the whole system should not exceed 95.52 MW at the time of commissioning and 95.77 MW in 15 years lifetime, commissioning of the entire system and operation and maintenance of complete commissioned system for 60 months on turnkey basis.

The estimated value of the project is Rs 1,315.88 crore with completion period of 42 months.

 