Illustrative image – not actual.
The detailed project report (DPR) of the proposed expressway between Nagpur and Mumbai will be finalised by the end of September 2016, after which tenders will be floated in October 2016.
The 710 km high-speed road corridor, connecting two key cities of the state and costing Rs 46,000 crore, will pass through nearly a dozen districts, most of them spread over backward Vidarbha and Marathwada regions.
