Municipal Corpn, Raipur issues tender for construction of water treatment plantIllustrative image – not actual.

The Municipal Corporation, Raipur has issued a tender for the construction of a 150 MLD water treatment plant (WTP) as part of a major initiative to strengthen the city’s drinking water infrastructure.

Valued at Rs 149.42 crore, the contract has a completion period of 24 months, including a three-month trial run. The scope covers the construction of a 16-metre diameter intake well, installation of a 1,200 mm diameter clear water pumping main, SCADA system and all associated infrastructure required for efficient water treatment and distribution. The selected contractor will be responsible for five years of comprehensive operation and maintenance (O&M), ensuring reliable performance of the entire water supply system.

Interested bidders are required to submit their proposals by 07 August, 2026.

← All latest storiesBack to top →