Illustrative image – not actual.The Municipal Corporation, Korba has invited bids for the design, construction, erection, testing and commissioning of a 20 MLD tertiary treatment plant.
The plant is designated to supply treated water to NTPC Korba, while supporting efficient water management and environmental conservation in the region. The contract has a completion period of 24 months, including a three-month trial run and the monsoon period. The contract involves establishing a state-of-the-art tertiary treatment facility based on ultra filtration (UF) and reverse osmosis (RO) technologies, housed within a Pre-Engineered Building (PEB) structure. The scope of work includes the construction of all associated civil infrastructure, process tanks, pumping stations and installation, erection and commissioning of pumping machinery and related equipment. The contractor will also be responsible for comprehensive operation and maintenance of the treatment plant, sump, pumping systems and associated infrastructure for 15 years after commissioning. The estimated cost is Rs 164.39 crore.
The bid submission deadline is 09 July, 2026.
