Mundka-Bahadurgarh metro trial runs to begin in Dec 2017Illustrative image – not actual.

The trial runs on Delhi Metro’s Mundka-Bahadurgarh stretch are likely to begin in December 2017. Once the 11.18 km long line starts in June 2018, Bahadurgarh will be the third Haryana town after Gurugram and Faridabad, in the DMRC fold.

Once the section becomes operational, it will take just one hour to travel from Rajiv Chowk to Bahardurgarh metro station.

The corridor is being constructed as part of the metro’s Phase-III project. It will have a total of seven stations -- four in Delhi and three in Haryana.

In Delhi, the stations will be Mundka Industrial Area (MIE), Ghevra; Tikri Kalan and Tikri Border. While in Haryana the three stations will be Modern Industrial Estate, Bus Stand, and City Park (Bahadurgarh).

The Mundka-Bahadurgarh Metro Corridor is an extension of the existing Inderlok-Mundka Corridor (Line-5).

It will be an elevated metro corridor along Rohtak road on NH-10.

← All latest storiesBack to top →