Illustrative image – not actual.
Mumbai City's second metro being set up by MMRDA is expected to be ready by 2019. The 16.5 km-long corridor will connect Andheri to Dahisar via the Western Express Highway.
The Andheri (E)-Dahisar (E) corridor, labelled as Metro VII, is expected to decongest the Western Express Highway significantly. Tenders for Phase I of Metro II (Dahisar to D N Nagar), to be executed by Delhi Metro Rail Corporation are also expected to be floated soon.
The tender documents will be available from 21 December 2015. MMRDA plans to execute the work in three packages to ensure timely completion of work. The three winning bidders will design and construct the entire corridor and 16 stations in 30 months.
The first package comprises designing and constructing an elevated viaduct and five elevated stations—Andheri (E), Shankarwadi, JVLR Junction, Mahanand and new Ashok Nagar. The second package consists of designing and constructing an elevated viaduct and six elevated stations—Aarey, Dindoshi, Pathan Wadi, Pushpa Park, Bandongri and Mahindra & Mahindra. And, the third package consists of designing and constructing an elevated viaduct and five elevated stations—Magathane, Devipada, National Park, Ovaripada and Dahisar (E).
