Illustrative image – not actual.The Jogheswari-Vikhroli Link Road
project – a major component of the Mumbai Urban Transport Project – is being
launched today, 14 May 2003, at the hands of the Maharashtra Chief Minister, Mr
Sushil Kumar Shinde.
The total cost of the 10.6 km link road that would connect the Eastern
and Western Express Highways is Rs.115 crore. Construction work would begin in
May 2003 and the project is targeted for completion within 20 months. The
project entails widening of the existing two-lane asphalt road connecting the
eastern and western suburbs into a six-lane cement concrete highway.
Besides, a 400 metre long flyover and a
vehicular-cum-pedestrian subway are being constructed at SEEPZ near Santacruz.
