Illustrative image – not actual.Mumbai is set to construct its longest road tunnel beneath the Sanjay Gandhi National Park as part of the Goregaon–Mulund Link Road (GMLR) project.
Starting in June 2026, nearly 700 workers, engineers, and consultants will begin round-the-clock excavation of the 6.65 km twin tunnel, which forms the core of the Rs 15,738-crore GMLR corridor. The tunnel will stretch from Film City in Goregaon to Khindipada in Mulund, reducing travel time between the two suburbs from 60–90 minutes to under 20 minutes. Excavation will use two Japanese tunnel boring machines (TBMs) with 13-mtrs. diameter cutter heads, navigating depths of 20–160 mtrs. beneath forested hills and water bodies to minimize ecological impact. Each tunnel will have three vehicular lanes, CCTV monitoring, LED lighting, and fire-suppression systems.
The project is part of a larger network including flyovers, bridges, and connectors linking the Western and Eastern Express Highways and integrating with the Versova–Bhayander coastal road. Completion is targeted for December 2028, thus improving East–West mobility.
