Mumbai Metro achieves tunnel breakthrough on Airport-Thane-Colaba routeIllustrative image – not actual.

The Mumbai Metropolitan Region Development Authority (MMRDA) has completed its first major tunnel breakthrough for Metro Line 7A, marking a significant milestone in the city's expanding metro network.

The tunnel, part of a 1.6-km stretch excavated using a tunnel boring machine (TBM), connects to Chhatrapati Shivaji Maharaj International Airport (CSMIA) and was executed despite significant engineering challenges. Metro Line 7A is set to transform transit in the region, connecting Colaba in South Mumbai with the northern suburbs of Vasai-Virar through Mira-Bhayander, and linking with Thane and the upcoming Navi Mumbai International Airport. 

The excavation began on 01 September, 2023, and required intricate planning, as the TBM had to manoeuvre above the operational Metro Line 3 and below the Sahar Elevated Road and other underground utilities. Two stations - Airport Colony (elevated) and CSMIA (underground), will be featured on this segment, offering direct and efficient access to the airport for both residents and visitors. As of now, 59 percent of the overall construction on Line 7A has been completed.

The tunnel breakthrough was commemorated in a ceremonial event where Maharashtra Chief Minister Devendra Fadnavis pressed the symbolic button. He was joined by Skill Development Minister Mangal Prabhat Lodha, MLA Parag Alwani, MMRDA Metropolitan Commissioner Dr. Sanjay Mukherjee, and Additional Commissioners Vikram Kumar and Ashwin Mudgal.

 

← All latest storiesBack to top →