Mumbai-Ahmedabad Bullet Train Project achieves milestone with 130-mtrs. steel bridge launch in BharuchIllustrative image – not actual.

The Mumbai-Ahmedabad Bullet Train project has achieved an engineering milestone with the successful launch of a 130-mtrs.-long steel bridge span over Indian Railway tracks near Tralsi village in Bharuch district, Gujarat.

The newly positioned section completes 230 mtrs. of the total 330-mtrs. bridge length, marking steady progress on the high-speed rail corridor. The bridge crosses the Dedicated Freight Corridor Corporation (DFCCIL) tracks between the Surat and Vadodara section of the Western Dedicated Freight Corridor. It is designed as a three-span structure comprising a 100-mtrs. simply supported span, a 130-mtrs. continuous span, and an additional 100-mtrs. continuous span. The 130-mtrs. segment, weighing around 2,900 tonne, was precisely launched using advanced hydraulic systems and coordinated engineering techniques, while earlier sections were assembled either in-situ or at specialised fabrication workshops in Gujarat. The steel structures, designed for a 100-year lifespan, were installed using high-strength bolts, protective coatings, and metallic bearings to ensure durability and safety.

The operation was executed with carefully managed freight traffic coordination to avoid disruptions, reflecting advanced construction planning and precision engineering in India’s high-speed rail infrastructure development.

← All latest storiesBack to top →