Illustrative image – not actual.
The total value of the project is Rs 302 crore. It will be a source of cheap power at a cost of Rs 1.85 per unit.
Ninety-five per cent civil work of the power house is completed and construction is moving at a quick pace. It will provide a permanent outfall structure for the Mukerian hydel channel Stage-I into river Beas. The electro-mechanical works have been executed by Bharat Heavy Electricals on EPC basis.
The hydel project has a 3.5 km newly built channel having a maximum carrying capacity of 11,500 cusecs of water. The total capacity of 18 MW will be generated from two units of nine MW each.
More Project Info:
Mukerian Hydel Power Project Stage II
