Illustrative image – not actual.Maharashtra State Road Development Corporation (MSRDC) has opened a pedestrian subway at Chembur connecting Chedda Nagar to Peston Sagar, in Mumbai. The subway has been constructed with an investment of Rs.2 crore.
Other salient features of the subway:
Ø
Length - 36 metres
Ø
Clear width – 3.5 metres
Ø
Clear height – 2.2 metres
Ø
Method of RCC box laying – by box pushing method, pushing of box by
Hydraulic jacks
Ø
Contractor – Larsen & Toubro, ECC
