Illustrative image – not actual.
According to MRVC, the 40-km long proposed Andheri-Virar corridor will help decongest the existing suburban corridor.
Earlier, MRVC pitched building the corridor upto Bandra, as suggested by the state government. But there was insufficiency of land on the stretch to lay the track or build a pier.
The 60-km long elevated corridor was shelved by the railway board after the project did not get any attention from the state government. The Churchgate-Virar elevated corridor was proposed to be built on a public-private-partnership model.
More Project Info:
Rail Corridor (Oval Maidan-Churchgate-Virar) Project
