Mozambique govt inaugurates 315 km Niassa HighwayIllustrative image – not actual.
The government of Mozambique has inaugurated the Niassa Highway. It was officially opened for public use by President Filipe Nyusi on 23 January 2020. The 315 km road passes between two cities in the northern province, Lichinga and Cuamba.

The 200 km rebuilt and paved stretch runs from the provincial capital, Lichinga, to Massangulo, capital of Ngauma district, and on to Muita. The final 115 km will run from Muita to Cuamba.

The road project has been constructed as per international standards and completed within scheduled date. The road is vital for Niassa and Nampula provinces, and forms part of a strategic link, via the border at Mandimba, between landlocked Malawi and the port of Nacala. The road is now 10 mtr wide.

On the Lichinga-Massagulo stretch two new bridges were built over the Lutembue and Lumbala rivers. Seven bridges were needed on the Massangulo-Mita stretch over the rivers Ngolua, Naganta (two bridges), Luchima, Lilase, Ninde and Lilumassi. In the Mandimba municipality, five km roads were tarred to connect the main road with the Malawian border, and a weigh-bridge was installed.

The road project was financed by the Japanese International Cooperation Agency (JICA), the African Development Bank (ADB) and the Mozambican government. The Lichinga-Massangulo-Muita stretch entailed an investment of about USD 105 million, and was financed by JICA.

← All latest storiesBack to top →