Illustrative image – not actual.The Sikkim government and the National Hydroelectric Power Corporation (NHPC) signed an MoU for the execution of the 510 MW Teesta Stage-V hydro electric power project in Sikkim. The project cost is estimated at Rs.2,500 crore. According to the MoU, NHPC would provide 12 per cent of the power generated from the project, free of cost to the Sikkim government. If the state is unable to utilise the power, NHPC would sell the power at the maximum sale rate prevalent at that time and give the sale proceeds to the state government. The project is expected to be completed by 2008.
