Illustrative image – not actual.Moser Baer Photovoltaic, a subsidiary of Moser Baer India, has won a contract from the Roads & Buildings Department of Gujarat, to set up roof-top solar photovoltaic installations in Surat.
The solar photovoltaic system with 135-KW-peak installed capacity will run a 40 KW load for 10 hours each day and charge a batter bank of 6,000 ampere hours. Work on the project has started and the system will be commissioned by April 2009.
