Illustrative image – not actual.
The Ministry of Road Transport & Highways through Chhattisgarh PWD has invited bids for the rehabilitation and up-gradation of NH-43 from 130 km to 180 km (Kanker to Bedma section) to two lane with paved shoulder under NHDP-IV through EPC basis contract.
The work is estimated to get completed within 24 months.
