Illustrative image – not actual.
Ministry of Road Transport & Highways (MoRTH) has invited bids for consultancy work including detailed project report (DPR) preparation for a four-lane road on NH-40 in Andhra Pradesh.
The feasibility study and DPR is for the construction of a four-lane road from Kadapa to Rangampeta cross via Rayachoti, and Pileru on NH-40, from Km 199/000 to Km 337/800 excluding Guvvala Cheruvu Ghat Tunnel and its approaches along with 2/4 lane bypass to Kadapa town by connecting NH-40 and NH-716.
The last date to submit the bid is 11 November, 2024.
