Modified DPR submitted for new road from Panjapur to Tiruchi-Karur highwayIllustrative image – not actual.

Tiruchi Corporation has submitted a modified detailed project report (DPR) to develop a road from the Panjapur to Tiruchi-Karur highway along the eastern bunds of Koraiyar and the Kudamuriti rivers. Under the revised proposal, eight acres of land had to be acquired at various locations.

The land has been identified, and a formal process for acquisition will begin shortly as the proposal receives administrative sanction. The length of the proposed road is expected to be around 12 km from the integrated bus terminal at Panjapur to Tiruchi-Karur Bypass. The project is estimated to cost about Rs 340 crore. As part of the project, an elevated carriageway would come up on Tiruchi-Dindigul highway near Karumandapam.

Moreover, the carriageway would be nine mtrs. wide and would be laid on the eastern bund of the Koraiyar and the Kudamuriti via Kuzhumayi Amman Temple and Woraiyur. The proposal, which aims to fix the alignment as well as finalise the junctions, bridges and other features, was submitted to the state government for administrative sanction.

The project also intends to decongest the traffic in Tiruchi city and strengthen the river banks to avoid breaches and flooding during monsoon. The firm had appointed a Chennai-based consultant to study the feasibility of converting the eastern bunds along these rivers into a motorable road to provide connectivity from Panjapur, where the integrated bus terminal is being built, to Tiruchi-Karur Bypass.

← All latest storiesBack to top →