Illustrative image – not actual.The Ministry of Non-conventional Energy Sources (MNES) has formulated a scheme to increase the number of small hydro power (SHP) power projects in India.
Under the scheme, the ministry was giving subsidy to both state and private sector projects for installation of SHP projects up to 25 MW capacity. So far, 522 SHP projects accounting for a total generation capacity of 1,705 MW have been set up while 205 more projects aggregating 479 MW were under implementation as on February 28, 2005.
Of these, 66 projects have been set up in decentralized mode for electrification of 104 remote villages and 51 more such projects were under implementation for energizing 156 villages.
The highest numbers of such SHP projects, already set up, are in Uttaranchal (75) with a capacity of 72.45 MW while Karnataka accounts for the highest capacity build-up of 276.78 MW through 49 projects.
In terms of numbers, Andhra Pradesh and Arunachal Pradesh with 57 projects each with a capacity of 178.81 MW and 33..80 MW, respectively fall jointly in the second place.
In terms of the highest capacity build-up, Madhya Pradesh with 207.08 MW and Andhra Pradesh with 178.81 MW are in the second and third position, respectively.
SHP projects, usually connected to the grid, are set up on rivers and canal drops, mostly in rural areas. Wherever there is potential, decentralized SHP projects are also being set up for electrification of remote villages.
