Illustrative image – not actual.The Mumbai Metropolitan Region Development Authority (MMRDA) has successfully completed the first 250 mtrs. of underground excavation for the Orange Gate road tunnel.
This project, which connects the Eastern Freeway to Marine Drive, is a cornerstone of the newly branded "Patal Lok" Road Network—a visionary underground grid designed to act as a "shadow system" to Mumbai's congested surface roads. Tunnelling is being executed using the "Mavala" TBM, the largest slurry shield tunnel boring machine in India, with a diameter of 12.19 metres. The machine operates at depths of up to 50 metres to avoid existing metro lines and high-rises. So far, over 575 permanent segmental rings have been installed to line the tunnel cavity. The 4.8 km twin-tunnel system is engineered for speeds of 80 km/h and is expected to slash peak-hour travel times from 40 minutes to just five minutes.
Chief Minister Devendra Fadnavis highlighted that this project marks a shift toward "subterranean mobility," aiming to make Mumbai traffic-free within three years. The total "Patal Lok" network is envisioned to span 70 km across three phases at an estimated cost of Rs 1.05 lakh crore.
