Illustrative image – not actual.
The Mumbai Metropolitan Region Development Authority (MMRDA) is planning to appoint a consultant to check the quality of construction of Metro line 2A from Dahisar to D N Nagar.
Once appointed, the consultant will inspect the strength of pillars, viaducts, stations and so on. The design, pier caps, pier, strength and quality of concrete used will be inspected by the appointed consultant.
Once appointed, the consultant is expected to take around two to three months to complete the required inspection and submit the final report.
