Illustrative image – not actual.The MMRDA has chalked out plans for a 100 km corridor from Virar to Alibaug at an investment of Rs 12,000 crore which will have rail and road links. The proposed corridor will enable the travellers to cover this distance in one hour than the current four hours.
The proposed corridor will have eight lanes and a metro rail link in the centre. The MMRDA has sought the assistance of international consultants for preparing the master plan of the corridor. The corridor will also have a lane dedicated to the Bus Rapid Transport System (BRTS) and two service lanes, taking the total number of road lanes to ten.
The MMRDA has already invited bids to shortlist consultants and the DPR is likely to be ready in another six months. Huge open areas along the state highway between Alibaug and Panvel, the one along Taloja railway line up to Kalyan-Dombivli, another open space (that presently belongs to the forest department) between Thane and Virar will be acquired for the project.
Also See:
Charkop metro car depot issue solved: MMRDA (01-Jun-09)
Related Links:
Project profile
