MMRDA plans two new ring roads to expand network to 307 KmIllustrative image – not actual.

The Mumbai Metropolitan Region Development Authority (MMRDA) has launched plans for two additional ring roads spanning 307 km.

The eighth and ninth ring will expand the proposed metropolitan ring-road network from seven to nine corridors. Both corridors are planned as access-controlled routes with a maximum design speed of 80 kmph. The expanded network will connect Mumbai, Thane, Navi Mumbai and surrounding areas by integrating major roads, sea links, tunnels and existing transport corridors into a seamless system. The 307-kilometre network will not comprise entirely new construction, as it will incorporate existing infrastructure along with projects already under construction or in the planning stage. MMRDA is targeting 2029 for both routes to become operational.

Implementation will involve infrastructure developed by MMRDA, BMC, MSRDC and NHAI, with timelines dependent on individual road, tunnel, sea-link and interchange projects.

← All latest storiesBack to top →