MMRDA invites RfQs for MTHL projectIllustrative image – not actual.

Mumbai Metropolitan Region Development Authority has invited pre-qualifications for Mumbai Trans Harbour Link (MTHL) project on design-build basis on EPC in three separate packages.

  1. Mumbai Trans Harbour Link Project Package-1: Construction of 10.380 km long bridge section (Ch. 0.000 to Ch. 10.380) across the Mumbai Bay & Sewri interchange. The estimated cost of the project is Rs 6,600 crore.
     
  2. Mumbai Trans Harbour Link Project Package-2: Construction of 7.807 km long bridge section (Ch. 10.380 to Ch. 18.187) across the Mumbai Bay & Shivaji Nagar interchange. The estimated cost of the project is Rs 4,900 crore.
     
  3. Mumbai Trans Harbour Link Project Package-3: Construction of 3.613 km long viaduct (Ch. 18.187 to Ch. 21.800) including interchanges at SH-54 and NH-4B near Chilre, in Navi Mumbai. The estimated cost of the project is Rs 1,307 crore.


MTHL is a 22 km long cable stayed bridge that will link Sewri on the island city of Mumbai and Nhava on the hinterland. Once completed, it will be the second longest sea link in the world. Japan International Cooperation Agency (JICA) will be funding 80 percent of the project.

← All latest storiesBack to top →