Illustrative image – not actual.The Mumbai Metropolitan Region Development Authority (MMRDA) has invited Expressions of Interest (EOI) for the 9 km Andheri-Ghatkopar corridor of the MUTP. The cost of this stretch of the sky train project will be around Rs.800 crore. This stretch of the MUTP will also have a link to the international airport. The EoIs have been invited following a techno-economic feasibility study prepared for the rail based mass transit system by a German consultancy firm, De Consult. The study has recommended the Rapid Rail Transit System for this corridor.
According to the MMRDA Joint Commissioner, Mr. T. Chandrashekhar, the rail based mass transportation system will be mostly elevated with standard gauge and will be implemented within three years from the start of the project. There are possibilities that the project will be set up on Build-Operate-Transfer (BOT) basis including public or private partnership. The EoIs have been invited from both domestic and international parties. Shortlisting of the eligible firms for implementing the MRT system will be done through a bidding process once all the EoIs have come in.
The last date for submitting the EoIs is 8 September 2003. Further details can be had from the following address:
Chief, Transport and Communications Division
Mumbai Metropolitan Region Development Authority
Bandra Kurla Complex
Bandra (East)
Mumbai – 400 051.
