Illustrative image – not actual.
The Mumbai Metropolitan Region Development Authority (MMRDA) has appointed the Delhi Metro Rail Corporation (DMRC) as the interim consultant for the 23.6 km long DN Nagar-Mandala Metro-2B corridor and the 32 km long Wadala-Ghatkopar- Kasarvadavli Metro-4 corridor.
The role of DMRC as interim consultant is to prepare tender documents, invite tenders and assist the MMRDA in evaluation of the tenders for the Metro-2B and Metro-4 corridor.
The Metro-2B corridor is part of the Metro 2 (Dahisar-Charkop-Bandra-Mankhurd), which was earlier planned underground, but was later turned into an elevated corridor. The line was also divided into three parts, namely Dahisar-DN Nagar, DN Nagar-BKC (Bandra Kurla Complex) and BKC-Mankhurd.
