Illustrative image – not actual.
The consortium will assist MMRC in all activities concerning Metro-3 (the Colaba-Bandra-Seepz corridor).
The scope of work includes evaluation of bids for civil work and assistance in appointment of contractors; review and proof checking of detailed designs; preparing tender design and documents for procurement of track work, rolling stock and system components; supervision of supply and installation; system integration; testing and commissioning of system components; supervision of work and ensuring safety, quality and environmental aspects.
The consultants have been appointed on quality and cost-based selection process as was agreed and decided at the time of loan appraisal with the Japan International Cooperation Agency (JICA).
Metro-3 will connect the suburbs to south Mumbai.
More Project Info:
Colaba-Bandra-Seepz Metro Rail Project
